
Changes are coming. Geo-thermal heating and cooling is being installed in the P and R sections.

The drill is going 300 to 350 feet into the ground.

A look at the black-lace elderberry, which you will not want come to see, now that the noise of construction is here.
No comments:
Post a Comment